Overview

Project

Rock River Water Reclamation District Fuller Creek Trunk Sewer, Phase B

Location

Loves Park, IL

Fuller Creek Trunk Sewer, Phase B, Capital Project No. 0777, IEPA Project No. Ll7-4870 is comprised of 4,492 feet of 36″ and 2,910 feet of 30″ PVC sanitary sewer as well as various shorter lengths, diameters, and types of sanitary sewer. Two (2) lift stations are being abandoned. This gravity sewer will drain to the proposed Fuller Creek Regional Pumping Station at the corner of Cunningham and Centerville Roads.

Project Consist of Providing a Complete Electrical Power System For Dewatering Wells. 7000’ of Secondary Cabling, Installation of 3 Medium Voltage Transformers & 400 Amp Electrical Services. Decommissioning and Removal of Electrical Systems @ 2 Existing Lift Stations.

7,000
Secondary Cabling
7,402
PVC Sanitary Sewer